You are receiving this email because you either opted in, are a customer, or have expressed interest in our products at some time. If you would like to unsubscribe or change your subscriptions, please manage your preferences here. |
|---|
![]() |
Have a question about electrical safety? Eaton experts are just an email away! Submit your question here and receive feedback from Eaton’s electrical specialists within 48 hours. Please join us on November 12, 2008 for an EC&M Webcast entitled, "The Balancing Act - Trade-Offs With Arc Flash Safety, Selective Coordination and Protection" presented by EC&M and Eaton's Thomas Domitrovich and Chris Walker. Case Study "Weyerhaeuser Calls on Expertise from Eaton to Solve Arc Flash Application Problems" - by David Durocher-Forest Products Mgr. for Eaton Corporation Motor Control Centers account for the second highest frequency of of electrical accidents! Click here to see the statistics.
|
|||||
IN THIS ISSUE
|
Safety Matters Prepare-Prevent-Protect
|
|||||
|
||||||
VCP-TR Fixed Medium Voltage Vacuum Circuit Breakers Designed for use where space is at a premium, the VCP-TR is ideal for applications such as mine power centers, portable power substations, fixed Vacuum interruption offers the advantages of enclosed interrupters, reduced size and weight, short interrupting time, long life, reduced maintenance, and environmental compatibility.
|
||||||
| Solution Highlight Are all Low Voltage Motor Control Centers Created Equal? Not Exactly! If you have spent any time at all reading through the National Fire Protection Agency Standard 70E "Standard for Electrical Safety in the Workplace" you already know that arc-flash hazards present a very real danger to anyone working on or near energized equipment. The problem we see is that most every solution available today is of a "retrofit" nature - identify/quantify the hazard, then determine what protective clothing is necessary to minimize the risk. The final frontier in arc flash safety is FlashGard low voltage motor control center. Learn how Eaton is leading the way with our recent breakthrough development of the Cutler-Hammer FlashGard low voltage motor control center - our newest product designed to remove the risk of arc-flash exposure.
|
||||||
| Ask the Expert
Have a question about electrical safety? Eaton experts are just an email away! Submit your question here and receive feedback from Eaton’s electrical specialists within 48 hours. Q. Do you have arc flash training available for contractors and other maintenance personnel? If so, how do they sign-up or register? A. Eaton’s Electrical Services and Systems team is ready to deliver on-site training for you and the people of your organization who maintain and manage your electrical power distribution systems. Because training is conducted by the same engineers who perform short-circuit coordination and power quality studies and who troubleshoot equipment on a daily basis, you gain the most up-to-date information and learn the latest techniques and procedures. For more information or a price quote contact Eaton’s electrical training group at Read more here: Safety Means…Expert Analysis and Training
Listen to an Eaton podcast on Arc Flash Solutions.
This may be a new look for you. We are currently testing our creative. Tell us what you think! | ||||||